Loading
Project specifications
  • LFA: 14,000 m²
  • Function: Education, two restaurands and 128 student rooms
  • Start of construction: November 2011
  • Completion: July 2012
  • Location: Jan Everstsenstraat 171, Amsterdam
Ramada Apollo Hotel, Amsterdam

In 2009 Peak Development assisted Vastint (at that time Pronam) with the redevelopment of an empty office building in Amsterdam West. As soon as the last lessee had left, the 38,000-m² building in Rembrandtpark was transformed into the Ramada Apollo hotel. As it was the first large-scale transformation in Amsterdam, it was a pioneering enterprise for the municipality as well as a big challenge for Peak Development. It was a great success, and in recognition of the positive effect the building had on the district the project even won a prize.

Ramada Apollo Hotel, Amsterdam

In 2009 Peak Development assisted Vastint (at that time Pronam) with the redevelopment of an empty office building in Amsterdam West. As soon as the last lessee had left, the 38,000-m² building in Rembrandtpark was transformed into the Ramada Apollo hotel. As it was the first large-scale transformation in Amsterdam, it was a pioneering enterprise for the municipality as well as a big challenge for Peak Development. It was a great success, and in recognition of the positive effect the building had on the district the project even won a prize.

Project specifications
  • LFA: 14,000 m²
  • Function: Education, two restaurands and 128 student rooms
  • Start of construction: November 2011
  • Completion: July 2012
  • Location: Jan Everstsenstraat 171, Amsterdam